How long does an import take? Real timelines by stage

Transit times by lane and mode, how long customs clearance takes, and what makes an operation run late.

Updated July 26, 2026

Planning an import with the timeline wrong costs you lost sales or idle inventory. These are the timelines we see in live operations — not the brochure version.

Ocean transit to Mexican ports

OriginPort of arrivalTypical transit
China (Shanghai, Ningbo, Shenzhen)Manzanillo / Lázaro Cárdenas18 to 30 days
Southeast Asia (Vietnam, Thailand)Manzanillo25 to 35 days
Europe (Rotterdam, Hamburg, Valencia)Veracruz / Altamira18 to 28 days
South America (Brazil, Chile)Veracruz / Manzanillo12 to 22 days
U.S. East CoastVeracruz / Altamira5 to 12 days

Those are port-to-port times on direct services. If your shipment transships, add 5 to 10 days. And they’re estimates: weather, port congestion and schedule changes move these numbers.

Air and overland transit

  • Air from Asia: 3 to 7 days to Mexico City (AICM) or Guadalajara, including consolidation and connections.
  • Air from the U.S. or Europe: 2 to 5 days.
  • Cross-border trucking from the U.S.: 2 to 6 days depending on origin and the border crossing.

Customs clearance: 1 to 3 business days

With a complete file and the customs entry (pedimento) transmitted, clearance is fast. What stretches it out:

SituationTypical extra days
Everything in order, green light0 — clears the same day
Customs inspection (red light)1 to 3 days
Missing permit or NOM certificate3 to 15 days (or more)
Registry suspended or broker authorization not acceptedUntil the paperwork is resolved
Document mismatch (BL vs. invoice)1 to 5 days

The full math, end to end

For an ocean import from China, realistic planning looks like: production (15-45 days) + transit (18-30) + clearance (1-3) + inland delivery (1-4). That is, 5 to 12 weeks from placing the order to goods in your warehouse.

Inventory rule of thumb: if you sell a product that ships by ocean from Asia, your reorder point should assume at least 10 weeks. Plan on 6 and you’ll stock out twice a year.

What you can actually control

  • Have your registries and broker authorization (encargo conferido) ready before the goods ship (it costs no time when it runs in parallel).
  • Review the draft BL before it’s issued — fixing it afterward costs days.
  • Send your broker the documents when the vessel sails, not when it arrives: classification and filing can be pre-worked in transit.
  • Confirm NOMs and permits at the quoting stage, not at the port.

Need the transit time for your specific lane? Write to us with origin, destination and cargo type and we’ll give you the real schedule with confirmed sailings. And if a term doesn’t ring a bell, our glossary explains it in plain language.